The Challenge: Growth Without Blueprints
Power Electronics operates in 45 countries, with over 3,000 employees worldwide, and designs and manufactures high-power electrical equipment for solar farms, battery plants, and electric vehicle charging infrastructure. Their inverter technology helps some of the planet's largest energy companies meet their renewable targets. In Brisbane, their Eagle Farm facility is a critical hub for Oceania operations.
But Fast Fitouts isn't like most contractors.
Why Fast Fitouts Was the Perfect Fit
As Adam and Zak Parker explain, this is exactly where their business model shines. "With Fast Fitouts remaining a small, nimble, family-owned and operated company, we were able to offer a very competitive price and a quick turnaround. These jobs aren't for individual subcontractors to come in and do the work piecemeal—that leaves clients distracted, projects disjointed, and coordination lacking."
The reality is that small to medium-sized office refurbishments occupy an awkward middle ground in Brisbane's construction industry. They're too complex for individual trades to coordinate themselves, but often too "small" for major commercial builders to prioritise. It's precisely this gap that Fast Fitouts has built its reputation on over three decades.
Their approach to the Power Electronics project demonstrated why. Rather than insisting on full architectural documentation before starting conversations, Fast Fitouts met the Office Manager on-site, walked through the space, asked the right questions about how the team actually worked, and developed conceptual sketches that captured both the immediate needs and the longer-term vision.
What started as a request for "some doors" evolved into a comprehensive refurbishment that would transform the entire Eagle Farm office—and Fast Fitouts managed that evolution without derailing timelines or budgets.
The Transformation: More Than Meets the Eye
The scope of work that emerged told the story of a workplace that needed fundamental reimagining. The demolition phase alone revealed how dramatically the space would change: 38 linear meters of walls came down, along with 32 square meters of outdated joinery, 25 redundant power and data points, and even an internal rock garden that had become more of a liability than a feature.
But here's where Fast Fitouts' experience really showed. Rather than simply removing what didn't work and replacing it with standard solutions, they developed a fitout strategy that solved multiple problems simultaneously.
The curved plasterboard walls—8 linear meters of precision construction with integrated sound insulation—weren't just about aesthetics. They created the kind of fluid, modern workspace that reflects Power Electronics' innovative culture while providing the acoustic privacy essential for technical discussions about inverter specifications and energy storage solutions.
The ceiling work demonstrated a similar level of strategic thinking. Rather than patch-and-pray approaches that leave visible evidence of demolition, Fast Fitouts specified 38 square meters of suspended exposed grid with matching tiles, creating a cohesive aesthetic across the entire space. The three boardrooms received 30 square meters of Interface acoustic ceiling tiles, ensuring that client presentations and technical meetings could proceed without distraction or sound bleed.
The lighting upgrade—28 new LED panel lights replacing dated fixtures—wasn't just about energy efficiency (though that certainly mattered to a renewable energy company). It was about creating a workspace that felt modern and professional, aligned with Power Electronics' position as a technology leader.
The Details That Define Excellence
Fast Fitouts' strength in projects like this lies in their ability to manage complexity across multiple trades while maintaining momentum. The electrical work required relocating air conditioning controls from demolished walls and reconnecting lighting switches to main circuits—the kind of detailed coordination work that can derail less experienced contractors.
The plumbing scope involved disconnecting and reconnecting two toilet sink units while installing new 1000mm hand basin units with taps—work that required careful sequencing to maintain bathroom availability during construction.
The kitchen transformation showcased Fast Fitouts' custom joinery capabilities: 7 square meters of new cabinetry for fridge and storage, complemented by striking glass mirror splashbacks measuring 3600 x 600mm and 1500 x 600mm. These weren't just functional additions—they created a staff space that acknowledged the importance of team wellbeing in maintaining the excellence Power Electronics demands.
Even the flooring strategy showed thoughtful planning. Rather than wholesale replacement, Fast Fitouts specified 40 square meters of carpet tiles to match existing areas, minimising waste while ensuring consistency. New vinyl plank—30 square meters in bathrooms and kitchen, 23 square meters in the front entrance—created durable, professional surfaces in high-traffic areas while offering an optional tile upgrade for the entry if Power Electronics wanted to elevate the aesthetic further.
Perhaps most impressively, Fast Fitouts managed to reuse three existing aluminium and glass doors, supplying only new frames rather than complete replacements. This kind of strategic material reuse demonstrates both environmental consciousness and budget awareness—values that resonate with a company whose entire business model is built around sustainable energy solutions.
The Agility Advantage
The project timeline—22 days on site—might seem ambitious for such comprehensive work, but it reflects Fast Fitouts' systematic approach to coordination. As a family-owned operation with in-house expertise across carpentry, joinery, painting, electrical, and plumbing, they could sequence trades efficiently without the communication delays and finger-pointing that plague projects coordinated across multiple independent contractors.
This agility proved crucial for Power Electronics. In the renewable energy sector, growth opportunities emerge rapidly and market conditions shift quickly. The ability to transform workspace in under a month rather than the three-to-six month timelines typical of larger commercial projects meant Power Electronics could support their expanding team without losing momentum in a competitive industry.
But it's the scope evolution that really demonstrates Fast Fitouts' value proposition. What began as a request for door installation developed into a comprehensive refurbishment encompassing structural walls, custom joinery, complete ceiling replacement, lighting upgrades, bathroom renovations, kitchen transformation, and flooring throughout—yet the project stayed on track because Fast Fitouts could absorb that evolution without requiring complete re-quoting and re-documentation at each stage.
As Adam Parker notes, "Fast Fitouts are specialists in accommodating clients who don't have floor plans or who don't have the time or money to waste on getting professional architectural drawings done." For companies like Power Electronics—where the core business is designing solar inverters and energy storage systems, not managing office fitouts—this capability to handle design development, documentation, and construction within a single relationship is transformative.
Why This Matters for Brisbane Business
The Power Electronics project represents something larger than one successful fitout. It demonstrates why Brisbane's growing technology and renewable energy sectors need contractors who can operate at the intersection of professional quality and entrepreneurial agility.
These companies are driving Australia's energy transition, supporting the infrastructure that will power our economy for decades to come. When they need to expand workspace quickly to accommodate growth, they can't afford the six-month timelines and inflexible processes that characterise traditional commercial construction.
Fast Fitouts' three-decade track record—built on trust, reliability, and delivering value long after projects complete—positions them perfectly for this moment. They understand that the best fitout isn't necessarily the one with the highest-spec finishes or the longest construction timeline. It's the one that solves real business problems efficiently, professionally, and without drama.
For Power Electronics Australia, that meant transforming an outdated office into workspace worthy of a global renewable energy leader—in just 22 days, without architectural plans, and with a partner who could evolve scope as needs clarified without derailing timelines or budgets.
That's not just a successful fitout. That's the kind of construction partnership that helps Brisbane businesses compete globally.
Fast Fitouts - Office Alterations & Refurbishments
Phone: 1300 30 38 31
Email: info@fastfitouts.com.au
QBCC 1214722 | ABN 78 397 115 506
Lets GEt The Ball Rollng!
Enquire NowShare this Post
Related Articles
Healing Spaces By Design: Therapy Alliance Group's Comprehensive Beenleigh Transformation
From bare commercial shell to fully operational therapy clinic, Fast Fitouts delivered a comprehensive three-phase healthcare fitout for Therapy Alliance Group in Beenleigh. This 390 square metre transformation showcases specialized healthcare construction expertise, featuring clinical-grade acoustic partitioning, complete building services integration, and infection control-compliant finishes that elevate community healthcare standards.
Coastal Commerce Perfected: Tours Group's Circle On Cavill Retail Transformation
Fast Fitouts transformed Tours Group's retail space at Circle On Cavill Shopping Centre into a premium customer destination. Featuring custom display units with striking Knotwood ceiling features, curved service counters, and coastal-resilient finishes, this Surfers Paradise fitout demonstrates how strategic design drives retail success in high-traffic tourist locations.
Elevating Excellence - Trafquip HQ's Premium Brisbane CBD OFFICE JOINERY
When Amanda Trim from Trafquip HQ contacted Fast Fitouts in March 2025, she had a clear vision for their Level 8 office at 160 Edward Street in Brisbane's prestigious CBD.
