The Challenge: Creating a Professional Healthcare Environment from a Raw Shell

Standing in the empty 390 square metre space at 102-104 York Street, Beenleigh, Rachel Tosh saw beyond the exposed brick walls and bare concrete floors. Therapy Alliance Group needed more than just another clinic fitout – they required a comprehensive healthcare facility that would serve their community for years to come. The challenge? Transforming this raw commercial shell into a fully operational therapy clinic, complete with everything from ceiling infrastructure to clinical-grade amenities.

Rachel Tosh's vision was ambitious: transform nearly 390 square metres of bare space into a fully functional therapy clinic. The facility required multiple treatment rooms, each needing precise climate control, acoustic privacy, and a professional presentation. With exposed brick perimeter walls, multi-level flooring, and no existing ceiling infrastructure, this wasn't a simple renovation – it required comprehensive integration of building services and meticulous attention to healthcare-specific requirements.

Fast Fitouts' Phased Construction Strategy

What makes this transformation particularly impressive is Fast Fitouts' strategic approach to the complex build. Rather than attempting everything simultaneously, they developed a carefully phased construction program that allowed for efficient progress while managing intricate coordination between multiple specialised trades.

  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide

Phase One: Infrastructure Excellence

The foundation phase focused on essential systems. Fast Fitouts installed dual Temperzone climate control systems with comprehensive ductwork, individual LED display controls in each treatment room, and proper air circulation throughout. A substantial electrical distribution board and preliminary cabling were installed to meet future power needs.

The exposed brick perimeter walls were covered with plasterboard to achieve a smooth, clinical-appropriate surface. The showpiece was the suspended Armstrong ceiling system – carefully levelled despite underlying floor variations to create visual continuity throughout the space.

 

Phase Two: Defining Clinical Spaces

With infrastructure in place, Phase Two transformed the open shell into functional healthcare spaces. New off-white aluminium shopfronts created a professional presence on York Street, while comprehensive internal partitions, featuring fire-check plasterboard with R2 sound insulation, ensured absolute acoustic privacy.

Two custom Unifold bifold wall systems provide ultimate flexibility – engineered acoustic barriers achieving an RW45 rating that allow space reconfiguration while maintaining clinical-grade sound isolation. Premium Armstrong flooring was specified throughout: carpet tiles in clinical spaces, planked vinyl in high-traffic areas, and seamless vinyl in amenities for infection control compliance.

Custom joinery, including the reception counter and amenities benching, combined with comprehensive Dulux three-coat painting, created professional finishes throughout.

Phase Three: Systems Integration

The final phase brought everything together, featuring seventy-five LED panel lights with sophisticated room and master switching, fifty double power outlets, comprehensive data and WiFi infrastructure, and complete emergency lighting systems with thirty units, plus exit signage.

Clinical-grade plumbing services included PWD-compliant facilities with appropriate rails, quality tapware, and professional hot water systems. Fast Fitouts even excavated and poured a new concrete slab in the amenities area to accommodate the required infrastructure. Fire safety systems, including extinguishers, evacuation maps, and servicing of existing equipment, ensured complete regulatory compliance.

The Fast Fitouts Difference in Healthcare Construction

This project demonstrates why Fast Fitouts has become the preferred choice for healthcare facility construction. They understand that medical and allied health spaces require specialised knowledge – from acoustic requirements to infection control standards, accessibility compliance to clinical workflow optimisation.

The phased approach provided clear milestones that demonstrated progress in transformation, while comprehensive trade coordination ensured that multiple specialists worked in harmony. Thorough site cleaning ensured that clinical-grade standards were maintained throughout construction and at handover.

Building for Beenleigh's Healthcare Future

What's particularly noteworthy is how Fast Fitouts are designed for both immediate functionality and long-term adaptability. The comprehensive electrical and data infrastructure provides capacity for future technology integration. The bifold acoustic walls allow reconfiguration as service needs evolve. Quality finishes and robust building services ensure decades of peak performance.

The attention to healthcare-specific requirements – from acoustic privacy to infection control surfaces to accessibility compliance – shows Fast Fitouts' deep understanding that clinical spaces demand more than standard commercial construction. These are environments where design decisions have a direct impact on client comfort and treatment outcomes.

Investment in Community Healthcare

For healthcare providers like Therapy Alliance Group, investing in a purpose-designed clinical facility represents more than improving working conditions – it's about creating an environment that supports best-practice care delivery, provides comfort to clients during vulnerable moments, and reinforces the organisation's commitment to professional excellence.

Fast Fitouts delivered a transformation that works as hard as the clinical team, providing a beautiful, functional space that enhances both operational efficiency and client experience. From the moment patients walk through the York Street entrance, they encounter an environment that communicates professionalism, care, and clinical expertise – elevating the standard of allied health service delivery in the Beenleigh community.

 

Fast Fitouts - Alterations & Refurbishments

Phone: 1300 30 38 31
 Email: info@fastfitouts.com.au
 QBCC 1214722 | ABN 78 397 115 506

Lets GEt The Ball Rollng!

Enquire Now

Share this Post

Related Articles

Coastal Commerce Perfected: Tours Group's Circle On Cavill Retail Transformation

Fast Fitouts transformed Tours Group's retail space at Circle On Cavill Shopping Centre into a premium customer destination. Featuring custom display units with striking Knotwood ceiling features, curved service counters, and coastal-resilient finishes, this Surfers Paradise fitout demonstrates how strategic design drives retail success in high-traffic tourist locations.

Elevating Excellence - Trafquip HQ's Premium Brisbane CBD OFFICE JOINERY

When Amanda Trim from Trafquip HQ contacted Fast Fitouts in March 2025, she had a clear vision for their Level 8 office at 160 Edward Street in Brisbane's prestigious CBD.

Building for Growth - Motion Fluid Power Solutions' Multi-Level Expansion

Fast Fitouts transformed Motion Fluid Power Solutions' existing facility at 301 Orchard Road into a sophisticated multi-level workspace that supports both client meetings and team collaboration. The project featured 61 linear meters of strategic wall construction combining full-height private offices with glass-topped partitions to maintain visual flow. Seven custom timber doors, premium vinyl flooring, and purpose-built lunchroom joinery created a professional environment that reflects the company's leadership in hydraulic and pneumatic engineering solutions. Complete project coordination including Building Approval certification ensured seamless delivery while maintaining business operations throughout construction.

BLOG ARCHIVES

Oct 8, 2025, 1:13 PM
Oct 8, 2025, 12:50 PM
Sep 10, 2025, 11:01 AM
Jun 10, 2025, 8:27 AM
Jun 9, 2025, 2:41 PM
May 28, 2025, 2:38 PM
Mar 14, 2025, 3:36 PM
Dec 16, 2024, 1:56 PM
Oct 29, 2024, 2:18 PM
Oct 29, 2024, 12:27 PM
Aug 22, 2024, 10:49 AM
Jul 11, 2024, 10:49 AM
May 20, 2024, 10:49 AM
May 16, 2024, 10:54 AM
Apr 22, 2024, 9:11 AM
Feb 22, 2024, 11:44 AM
Feb 14, 2024, 2:57 PM
Nov 24, 2023, 9:26 AM
Oct 19, 2023, 9:20 AM
Sep 13, 2023, 2:37 PM
Aug 30, 2023, 9:11 AM
Aug 9, 2023, 8:20 AM
Jul 27, 2023, 10:00 AM
Jun 15, 2023, 9:11 AM
May 18, 2023, 12:06 PM